Project Description:

An engineering design was carried out in collaboration with "Avni Engineers LTD” to improve the a mooring platform's stability condition. The required repairs were conducted by “Nahshon Yam LTD”.

Our company participated in a unique project of designing a new mooring platform, due to disqualification of an old one, caused by severe stability issues.


The project was carried out in professional collaboration with “Avni Engineers” and offered an innovative solution that met the most stringent safety requirements.


As part of the project, detailed planning work was conducted, including complex engineering drawings, structural design, and the implementation of creative solutions to stability challenges.


The result: an improved, durable mooring platform, combining structural resilience with operational efficiency, ensuring compliance with the most demanding environmental and maritime conditions.